
Reach commercial operation without delays with a Finnish-made battery energy storage system. We take care of commissioning, operation and maintenance.
Get started
Whether you are planning to build a battery storage system on an empty site, add flexibility to renewable energy production, or implement a grid-scale battery system alongside large electricity consumption, Cactos is your partner.
We deliver a grid-scale battery storage system sized to your needs, without delays. We take care of delivery, installation, commissioning, operation and electricity market participation.
Participating in the electricity markets is currently available for projects in Finland. Contact us to find out about availability in your country.

Nevado is a high-power, liquid-cooled battery energy storage system designed for grid-scale projects. It is built to operate reliably even in the most demanding conditions.
Three variants are available, starting from over 2 MW of power and over 4 MWh of capacity per unit. By combining multiple units, the system scales up to 50 MWh.
Features and technical specifications


We can help with early-stage assessments as well as moving your plans forward. We'll get back to you soon.

We operate a fleet of over 300 battery storage systems and optimise its performance around the clock using weather forecasts, advanced algorithms and machine learning.
With our systems, you can participate in Nord Pool wholesale markets and ancillary service markets. We are also one of the first battery storage operators on the joint transmission and distribution network congestion management marketplace in Finland, providing a significant additional revenue stream.
Participation in the electricity markets is currently available for projects in Finland. Contact us to find out about availability in your country.
In geopolitically uncertain times, protecting critical infrastructure is more important than ever. Cactos systems are designed and built entirely in Finland at our factory in Kempele, without external parties. Our software and interfaces are built using the latest technologies and offer bank-level cybersecurity, compliant with the IEC 62443 standard.


Grid-scale battery energy storage systems are battery installations of at least one megawatt in size. They are used to balance the electricity system, store renewable energy and participate in electricity markets.
Typically, these are battery storage systems on separate sites whose revenues come from reserve and wholesale markets. The system can also be located alongside a large consumption site, where it can optimise the site's own electricity use in addition to generating market revenues.
Olipa kiinteistösi millainen tahansa, jokainen päivä energiamaailmassa on erilainen. Alla kerrotut hyödyt auttavat sinua suunnistamaan sähköverkossa säästäen samalla aikaa, energiaa ja rahaa. Ja vieläpä automaattisesti, sillä asiakkaana sinut ei tarvitse puuttua järjestelmän toimintaan, Cactos Spine tekee sen sinun puolestasi.
Who are Cactos grid-scale battery storage systems suitable for?
Our grid-scale battery storage systems are suited to grid operators, renewable energy producers and property developers who want to participate in wholesale and reserve electricity markets using battery storage. Grid-scale battery storage is also an excellent fit alongside large consumption sites such as industrial facilities or data centres for optimising electricity management.
Which markets does a Cactos battery storage system participate in?
In Finland, Cactos battery storage systems participate in Nord Pool intraday and day-ahead markets, Fingrid's reserve markets (FCR-N, FCR-D, aFRR), and the joint transmission and distribution network congestion management marketplace.
Currently, participation is available in Finland. Contact us to learn more about your country's status.
Who handles the trading?
Cactos handles everything related to battery storage optimisation and trading automatically via the Cactos Spine software.
How are market revenues paid to the customer?
Market revenues are settled to our customers once a month.
What size system can Cactos deliver?
Cactos can currently deliver systems of up to 50 MWh in capacity.
What warranties and maintenance does Cactos offer?
The leasing agreement includes a 10-year full warranty. For direct purchases, the warranty is 2 years, extendable for an additional fee.
System monitoring, updates and maintenance are included in the agreement.
How does a project start and how long does it take?
The project begins with an assessment of the land area and grid connection possibilities, as well as the project goals. The typical permitting process varies by municipality and most often takes 2–3 months. Cactos battery storage systems have a delivery time of approximately 9 months from order to commercial operation.
What is the customer's responsibility in the project?
The customer is responsible for permitting, civil works and foundations, and the grid connection. For Nevado systems, the transformer and transformer substation are always included in Cactos' scope of delivery. We can also discuss a broader turnkey implementation if preferred.
Do you have a land area or an ongoing project? We are your partner at every stage — from project development to system delivery.